New Marriott Hotel, Cable Street, New Cross, City of Manchester

13 10 2016

Cable street.jpg

 

The Stilwell Partnership supported the successful Planning Application by Axcel Property Developments Ltd for a new Marriott hotel providing multidisciplinary design advice including Highways & Transportation, Drainage, Low Carbon Energy and Noise Assessments.

A full Planning Application was submitted for a 172-bedroom hotel on the brownfield site of a surface car park in Cable Street in Manchester’s New Cross area. The development comprised the hotel (Class C1) with associated public realm, landscaping and other associated work. Proposals included a café bar, fitness centre, meeting rooms and associated servicing areas.

Our package of engineering design services included:

A Transport Statement of the development’s transportation impact on the local highway network. Our assessment considered sustainable forms of transport, including opportunities for walking and cycling, and the accessibility to public transport. We also considered servicing and emergency vehicle access. Our assessment concluded that the development could be accommodated without detriment to vehicular flows and road safety.

A Drainage Strategy, to minimise the impact on the wider area from surface and foul water from the proposed development. The very confined site limited the range of sustainable drainage options. An attenuation solution was identified to control the surface water run-off.

The Noise Assessment highlighted the application site was in a relatively noisy area impacted from road traffic noise on the A665 Addington Street.  Mitigation action proposed triple glazing to the bedrooms on the assumption the hotel would have air conditioning, to control internal noise levels to meet the standards set by WHO and BS 8233:2014.

Manchester City’s Planning Policies place great emphasis on decentralised energy schemes in the City centre. Using our CHP modelling software, the Sustainable Energy Assessment determined that the proposed development would be able to potentially contribute towards a future local district heating scheme and achieve an improvement of at least 15% CO2 emissions based on the predicted energy demand.

 

See the project sheet here: http://stilwell-ltd.co.uk/Projects/Cable_Street

 

Advertisements

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: