Derbyshire Development Wins Planning

12 07 2017

The Stilwell Partnership were pleased to help their long-standing client, Tapton Estates, win Outline Planning Approval for the proposed development of Derwentside Industrial Park, Belper, Derbyshire.

Amber Valley Borough Council unanimously approved the Application on 11 July 2017.

The scheme comprised the demolition and clearance of existing industrial buildings and re-use of the 6-ha site for 136 residential units.  The proposals also included access improvements and associated works.

Belper Tapton Master Plan

The Stilwell Partnership, with colleagues from the Patrick Parsons Group, put together a comprehensive package of technical assessments addressing many of the contentious issues and potential financial challenges facing development of the site:

The Transportation Assessment addressed potential future Traffic Impact and the long-term sustainability of the site.

The Travel Plan Framework provided an overall strategy to encourage sustainable transport measures; to increase walking, cycling, use of public transport and encourage more efficient car-use.

The Geo-Environmental Assessment examined the geotechnical issues on the site including ground conditions, potential contamination, and the building foundation requirements.

The Utility Constraints Assessment ensured there was adequate service capacity for future development without major investment in utility diversions.

The Flood Risk Assessment and Drainage Strategy confirmed that there was minimal flood risk on the site and that a foul and surface water drainage system was feasible within the capacity of local network.

The Noise Assessment considered the impact of noise from nearby roads and suggested mitigation measures that could be incorporated into future development.

On this proposed development, the Stilwell Partnership worked closely with the other project team members; David Lock Architects, FPCR Environment and Design Ltd and Rigby and Co, Commercial Property Agents.

If you would like to know more about these individual reports, or how we can deliver a successful one-stop package of services for your development, please phone our office on 0333 700 401 or email us

 





New Marriott Hotel, Cable Street, New Cross, City of Manchester

13 10 2016

Cable street.jpg

 

The Stilwell Partnership supported the successful Planning Application by Axcel Property Developments Ltd for a new Marriott hotel providing multidisciplinary design advice including Highways & Transportation, Drainage, Low Carbon Energy and Noise Assessments.

A full Planning Application was submitted for a 172-bedroom hotel on the brownfield site of a surface car park in Cable Street in Manchester’s New Cross area. The development comprised the hotel (Class C1) with associated public realm, landscaping and other associated work. Proposals included a café bar, fitness centre, meeting rooms and associated servicing areas.

Our package of engineering design services included:

A Transport Statement of the development’s transportation impact on the local highway network. Our assessment considered sustainable forms of transport, including opportunities for walking and cycling, and the accessibility to public transport. We also considered servicing and emergency vehicle access. Our assessment concluded that the development could be accommodated without detriment to vehicular flows and road safety.

A Drainage Strategy, to minimise the impact on the wider area from surface and foul water from the proposed development. The very confined site limited the range of sustainable drainage options. An attenuation solution was identified to control the surface water run-off.

The Noise Assessment highlighted the application site was in a relatively noisy area impacted from road traffic noise on the A665 Addington Street.  Mitigation action proposed triple glazing to the bedrooms on the assumption the hotel would have air conditioning, to control internal noise levels to meet the standards set by WHO and BS 8233:2014.

Manchester City’s Planning Policies place great emphasis on decentralised energy schemes in the City centre. Using our CHP modelling software, the Sustainable Energy Assessment determined that the proposed development would be able to potentially contribute towards a future local district heating scheme and achieve an improvement of at least 15% CO2 emissions based on the predicted energy demand.

 

See the project sheet here: http://stilwell-ltd.co.uk/Projects/Cable_Street